首页> 外文期刊>International Journal on Hydropower & Dams >Sabunsuyu develops hydropower from an irrigation canal
【24h】

Sabunsuyu develops hydropower from an irrigation canal

机译:Sabunsuyu通过灌溉渠开发水力发电

获取原文
获取原文并翻译 | 示例
           

摘要

In September 2010 the 6544 kW Sabunsuyu hydro station, close to the city of Adana, 50 km from Turkey's border with Syria, was commissioned. The powerplant, with a number of innovative features, has been built by developer ANG Energy, a subsidiary of the Kaya Group, to maximize discharge available at an irrigation scheme. ANG Energy acquired the licence to develop the hydroelectric potential of the irrigation canal which supplies water to the surrounding agricultural areas, over a distance of about 11 km, especially in the dry summer months. The concept provided for a discharge rate of 6.3 m~3/s which is conveyed from the canal via an inlet structure and supplied to the powerhouse through a 1.4 km-long DN 1.500 high-pressure steel pipe.
机译:2010年9月,靠近土耳其阿达纳市(距土耳其与叙利亚边界50公里)的6544 kW Sabunsuyu水电站投入运行。该发电厂由Kaya集团的子公司开发商ANG Energy建造,具有许多创新功能,可最大程度地提高灌溉计划中的排放量。 ANG能源公司获得了开发灌溉渠水电潜力的许可证,该渠能在大约11公里的距离内向周围的农业地区供水,尤其是在干燥的夏季。该概念提供了6.3 m〜3 / s的排出速率,该排出速率通过一条入口结构从运河中输送,并通过1.4公里长的DN 1.500高压钢管输送到动力室。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号