...
首页> 外文期刊>International Journal on Hydropower & Dams >EPS and Seci Energia plan schemes on the Drina
【24h】

EPS and Seci Energia plan schemes on the Drina

机译:Drina上的EPS和Seci Energia计划方案

获取原文
获取原文并翻译 | 示例
           

摘要

Serbia's State power company Elektroprivreda Srbije, signed a preliminary agreement on 11 January with Italy's Seci Energia, a subsidiary of the Maccaferri Group, to develop jointly ten hydropower plants with an installed capacity of more than 300 MW on the middle reaches of the River Drina, on the border between Serbia and Bosnia-Herzegovina. Construction of the project, which is expected to cost an estimated €819 million (US$ 1.1 billion), should begin in 2012, according to Gaetano Maccaferri, President of Bologna-based Seci Energia. The agreement was signed by Maccaferri and Dragomir Markovic, EPS General Manager, in the presence of Serbia's Minister of Energy Petar Skundric and Italy's Minister of Economic Development, Paolo Romani.
机译:塞尔维亚国家电力公司Elektroprivreda Srbije于1月11日与意大利Maccaferri集团的子公司Seci Energia签署了初步协议,共同在德里纳河中游开发十座水电站,装机容量超过300 MW,在塞尔维亚和波斯尼亚和黑塞哥维那之间的边界上。总部位于博洛尼亚的Seci Energia总裁加埃塔诺·马卡费里(Gaetano Maccaferri)表示,该项目的建设预计将于2012年开始,预计耗资约8.19亿欧元(11亿美元)。该协议由Maccaferri和EPS总经理Dragomir Markovic签署,塞尔维亚能源部长Petar Skundric和意大利经济发展部长Paolo Romani在场。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号