摘要

The last hydro project in Brazil with an installed capacity of more than 1 GW using Kaplan turbines was the Porto Primavera scheme. As Brazil's energy plans again appear to call for low head plants of that size, or greater, and as around 10 GW of new large Kaplan capacity (>50 MW/unit) has been subsequently added worldwide since Porto Primavera, it seems timely to examine some of the recent trends in the market. In October 2003, the last of the 14 generators at the Eng. Sergio Motta dam, formerly and also known as the Porto Primavera dam, went into operation. Owned by Companhia Energetica de Sao Paulo (CESP), this plant is on the Parana river, 28 km upstream from the confluence of the Paranapanema and Parana rivers, near the city of Rosana in Sao Paulo, Brazil. Constructed for hydropower production, flood control and navigation, with an installed capacity of 1540 MW (14 x 110 MW), the plant represents the largest Kaplan hydropower project to be completed in Brazil in the last decade, and is equipped with some of the largest Kaplan turbines installed in Brazil (8.6 m runner diameter). The turbines and generators were supplied by Alstom.
机译:巴西最后一个使用Kaplan涡轮机的装机容量超过1吉瓦的水利项目是Porto Primavera计划。由于巴西的能源计划似乎再次要求使用这种规模或更大规模的低水头电厂,并且自波尔图·普里马维拉港之后全球范围内又增加了约10吉瓦的新大型Kaplan容量(> 50兆瓦/单位),因此似乎是时候进行审查了市场上的一些近期趋势。 2003年10月,英格14台发电机中的最后一台。塞尔吉奥·莫塔(Sergio Motta)大坝(前称Porto Primavera大坝)开始运营。该工厂由巴西圣保罗州能源公司(CESP)拥有,位于巴拉那河上,位于巴拉那帕内玛河和巴拉那河汇合处上游28公里处,靠近巴西圣保罗罗萨纳市。该工厂是为水电生产,防洪和航行而建造的,装机容量为1540兆瓦(14 x 110兆瓦),是过去十年巴西最大的Kaplan水电项目,并配备了一些最大的水电项目。卡普兰涡轮机安装在巴西(转轮直径8.6 m)。涡轮机和发电机由阿尔斯通提供。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号