...
首页> 外文期刊>International Journal on Hydropower & Dams >Revision of planning for the Ankara, Beypazari and Urus projects
【24h】

Revision of planning for the Ankara, Beypazari and Urus projects

机译:修改安卡拉,贝帕扎里和乌鲁斯项目的规划

获取原文
获取原文并翻译 | 示例
           

摘要

Located 4 km northwest of Beypazari, Urus is located on Süvari creek which is the main water source of the project. The project area covers approximately 5000 ha of irrigation land. The project will also provide total potable water of 6.7 ×10~6 irrVyear to the towns of Beypazari, Glidul and Urus from the reservoir which has a total volume of 38 ×10~6 m~3. The concrete faced rockfill dam has a total fill volume of 3.1×10~6 m~3. The water intake structure serves for potable water, irrigation water and bottom outlet as a combined branching structure. The branches will have separate connections to each system as pressurized pipes. The irrigation main channel will be connected into the irrigation network of the 5000 ha of irrigation land, and potable water mains will convey water into the relevant water treatment plants.
机译:Urus位于Beypazari西北4公里处,位于苏瓦里河(SüvariCreek),这是该项目的主要水资源。项目区占地约5000公顷。该项目还将从水库向Beypazari,Glidul和Urus镇提供总饮用水量为6.7×10〜6 m〜3的6.7×10〜6 irrV年。混凝土面板堆石坝的总填充量为3.1×10〜6 m〜3。取水结构可作为饮用水,灌溉用水和底部出口的组合分支结构。分支机构将通过压力管道分别连接到每个系统。灌溉干渠将连接到5000公顷灌溉土地的灌溉网络中,而饮用水干线将把水输送到相关的水处理厂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号