...
【24h】

PowerBuoy 150 starts sea trials

机译:PowerBuoy 150开始海上试航

获取原文
获取原文并翻译 | 示例
           

摘要

Trials of the first of its new generation utility-scale PowerBuoy(R), the PB150, are now underway at a site approximately 33 nautical miles from Invergordon, off Scotland's northeast coast. They are expected to last up to three months. A broad range of operations and functional tests are being carried out, to examine the response of the machine's structure and mooring system to the waves and the power produced by the on-board generator. A wave data buoy near the site provides detailed information on the incoming waves. Data collected during the trials are being transmitted from the unit in real-time for analysis by OPT's engineers in both the UK and the USA.
机译:新一代公用事业级PowerBuoy(R)的第一款产品PB150,目前正在距苏格兰东北海岸因弗戈登(Invergordon)约33海里的地点进行试验。他们预计将持续三个月。正在进行广泛的操作和功能测试,以检查机器结构和系泊系统对船上发电机产生的波浪和动力的响应。站点附近的海浪数据浮标提供了有关传入海浪的详细信息。试验期间收集的数据将从装置实时传输,由OPT在英国和美国的工程师进行分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号