...
首页> 外文期刊>The international journal on hydropower & dams >Slovenia's Avce pumped-storage plant is inaugurated
【24h】

Slovenia's Avce pumped-storage plant is inaugurated

机译:斯洛文尼亚的Avce抽水蓄能工厂开业

获取原文
获取原文并翻译 | 示例
           

摘要

Slovenia's first pumped-storage project has begun commercial service after an inauguration ceremony held on 30 March. The 185 MW Avce project on the Soca river in western Slovenia cost about €122 million (US$ 164.5 million) to build and is projected to generate average peak output of about 426 GWh/year. The owner-operator of the plant is the regional power utility, Soske Elek-trarne Nova Gorica, a subsidiary of Slovenia's state power producer Holding Slovenske Elektrarne.
机译:在3月30日举行就职典礼后,斯洛文尼亚的第一个抽水蓄能项目已开始商业服务。斯洛文尼亚西部Soca河上185兆瓦Avce项目的建设成本约为1.22亿欧元(1.645亿美元),预计年平均峰值发电量约为426 GWh。该电厂的所有者-运营商是区域电力公司Soske Elek-trarne Nova Gorica,它是斯洛文尼亚国家电力生产商Holding Slovenske Elektrarne的子公司。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号