...
首页> 外文期刊>International Journal on Hydropower & Dams >Lesce starts trial run in Croatia
【24h】

Lesce starts trial run in Croatia

机译:Lesce在克罗地亚开始试运行

获取原文
获取原文并翻译 | 示例
           

摘要

Croatia's State power company Hrvatska Elektroprivreda (HEP) started a trial run of its newly constructed Lesce hydropower plant in mid-October. The 42.29 MW hydropower project, the first to be built in Croatia since it gained in dependence from the former Yugoslavia in 1991, was recently inaugurated by Prime Minister Jadranka Kosor. The US$ 123.4 million powerplant, on the Dobra river, is expected to produce 98 GWh/year.
机译:克罗地亚国家电力公司Hrvatska Elektroprivreda(HEP)于10月中旬开始对其新建的Lesce水电站进行试运行。 42.29兆瓦水电项目是自1991年从前南斯拉夫获得依赖以来在克罗地亚建造的第一个水电项目,最近由贾德兰卡·科索尔总理主持开幕。多布拉河上耗资1.234亿美元的发电厂,预计将产生98 GWh /年的发电量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号