...
首页> 外文期刊>The international journal on hydropower & dams >Main features of the Salto Pilao hydro scheme in Brazil
【24h】

Main features of the Salto Pilao hydro scheme in Brazil

机译:巴西Salto Pilao水电计划的主要特征

获取原文
获取原文并翻译 | 示例
           

摘要

The Salto Pilao hydro plant, with an installed capacity of 182.3 MW, is currently under construction on the Itajai-Acu river in the south of Brazil. The main features and innovative aspects of its underground layoutrnare discussed here.rnThe Salto Pilao hydroelectric plant, with an installed capacity of 182.3 MW, is currently being constructed on the Itajai-Acu river, which flows through the municipalities of Apiuna, Ibirama and Lontras in Santa Catarina State, southern Brazil. The principal purpose of the dam is hydropower to supply the grid. The project is being undertaken by Consorcio Empresarial Salto Pilao (CESAP).rnCESAP awarded an EPC turnkey contract for implementation of the project to the Uniao de Empresas Fornecedoras de Salto Pilao (UNESAP).
机译:Salto Pilao水电站的装机容量为182.3 MW,目前正在巴西南部的Itajai-Acu河上建设中。地下布局的主要特征和创新方面在此进行了讨论。萨尔托皮劳水力发电厂目前正在伊塔亚伊-阿库河上建造,装机容量为182.3兆瓦,该河流经阿皮纳,伊比拉马和隆特拉斯等市。巴西南部圣卡塔琳娜州。大坝的主要目的是为电网供电的水力发电。该项目由Consorcio Empresarial Salto Pilao(CESAP)承担。rnCESAP已与Saliao Pilao的Uniao de Empresas Fornecedoras de Salto Pilao签订了EPC总承包合同,以执行该项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号