...
首页> 外文期刊>The international journal on hydropower & dams >... As the Peruvian Government plans 500 MW of new hydro capacity
【24h】

... As the Peruvian Government plans 500 MW of new hydro capacity

机译:...随着秘鲁政府计划新增500兆瓦水电装机容量

获取原文
获取原文并翻译 | 示例
           

摘要

The Peruvian Government has announced plans to hold a tender in June for the construction 500 MW of new hydropower capacity. Minister of Energy and Mines, Pedro Sanchez Gamarra, announced on 12 April that he hopes the capacity will come on line in 2013, allowing for the country to reduce its dependence on electricity generated by thermal powerplants firing on natural gas from the country's Camisea field.rnLimited pipeline capacity has meant that not all the new plants have been able to operate at capacity, threatening power supplies."I believe we have to make an effective plan to transform the energy mix, to change part of the generation based on fossil fuels to renew-ables, principally hydroelectricity, because Peru has sufficient reserves of hydropower," the Minister explained.
机译:秘鲁政府已宣布计划在6月举行招标,以建设500兆瓦的新水电容量。能源和矿产部长佩德罗·桑切斯·加马拉(Pedro Sanchez Gamarra)在4月12日宣布,他希望该装机容量能在2013年上线,从而使该国能够减少对热电厂从该国Camisea油田燃烧天然气所产生的电力依赖。有限的管道运输能力意味着并非所有新电厂都能够满负荷运转,从而威胁到电力供应。“我相信我们必须制定有效计划,以改变能源结构,改变部分基于化石燃料的发电方式。可再生能源,主要是水力发电,因为秘鲁有足够的水电储备。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号