...
首页> 外文期刊>The international journal on hydropower & dams >Dam site works for El DiquI, Costa Rica
【24h】

Dam site works for El DiquI, Costa Rica

机译:坝址为哥斯达黎加的El DiquI工作

获取原文
获取原文并翻译 | 示例
           

摘要

The Costa Rican Electricity Institute (ICE), which is responsible for developing, implementing and marketing all public services related to electricity and telecommunications in the country, is going ahead with development" of the 608 MW El Diquis hydroelectric project. ICE will carry out a prequalification process for the bidding process for the construction of the dam site works for this project. The prequalification documents will be published in July, and information can be viewed on the website (see details below).
机译:负责开发,实施和销售该国所有与电力和电信相关的公共服务的哥斯达黎加电力学院(ICE)正在“ 608 MW El Diquis水电项目的开发中继续前进。ICE将开展一项该项目大坝工地施工招标过程中的资格预审程序,资格预审文件将于7月发布,有关信息可在网站上查看(请参阅下面的详细信息)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号