...
首页> 外文期刊>The international journal on hydropower & dams >Bui bridges the development gap between north and south in Ghana
【24h】

Bui bridges the development gap between north and south in Ghana

机译:布依缩小了加纳北部和南部之间的发展差距

获取原文
获取原文并翻译 | 示例
           

摘要

Ghana, as a developing country, faces a number of challenges. One is the vast disparity in the developmentrnbetween northern and southern parts of the country. Development in the north is slow because of undeveloped potential natural energy resources (hydro and solar). As a result, the populace in the northernrnsector sees migration to the south as a solution to improve their living standards. This has overstretchedrnexisting infrastructure in the southern part of the country. The 400 MW Bui hydroelectric project will playrna major role in the socio-economic development of Ghana (especially the north) and could later also bernbeneficial for a wider region of West Africa, in the context of the West Africa Pool Project.
机译:加纳作为一个发展中国家,面临许多挑战。一是该国北部和南部地区之间的巨大发展差异。由于潜在的自然能源资源(水和太阳能)尚未开发,北部的发展缓慢。结果,北部地区的民众将向南方的迁移视为改善其生活水平的解决方案。这使该国南部现有的基础设施过度紧张。 400兆瓦的布伊水力发电项目将在加纳(特别是北部)的社会经济发展中发挥重要作用,并且在西非泳池项目的背景下,以后也可能对西非的更大地区有利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号