...
首页> 外文期刊>International Journal on Hydropower & Dams >J&K invites pre-qualification for 690 MW Ratle scheme
【24h】

J&K invites pre-qualification for 690 MW Ratle scheme

机译:强生邀请690 MW Ratle计划通过资格预审

获取原文
获取原文并翻译 | 示例
           

摘要

Jammu & Kashmir State Power Development Corporation Ltd (JKSPDCL) has invited pre-qualification applications by 6 August for the development of the 690 MW Ratle hydro project on the river Chenab, in the Kishtwar district of Jammu & Kashmir. The project, which is open to both national and international developers, is to be developed on a Build, Own, Operate and Transfer (BOOT) basis under a 35-year concession. The winning bidder will be required to offer no less than 15 per cent of the output of the plant to the State of J&K without any charge.
机译:查mu与克什米尔邦电力发展有限公司(JKSPDCL)已于8月6日邀请资格预审申请,以开发查Jam与克什米尔基什特尔地区Chenab河上的690兆瓦Ratle水电项目。该项目面向国内和国际开发商开放,将在35年的特许经营权基础上进行开发,拥有,运营和转让(BOOT)。中标人将被要求向J&K州提供不少于该工厂总产量的15%,且不收取任何费用。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号