首页> 外文期刊>International Journal on Hydropower & Dams >The Use Of A Grp Penstock At Conceocion, Panama
【24h】

The Use Of A Grp Penstock At Conceocion, Panama

机译:在巴拿马康塞普西翁使用Grp Penstock

获取原文
获取原文并翻译 | 示例
           

摘要

The Concepcion hydroelectric project, on the Piedras river in Panama, has an installed capacity of 10 MW; two 5 MW Francis units operate under a net head of 69.45 m with a discharge of 20 m~3/s. Water is conveyed to the powerhouse through a penstock comprising 2194 m of GRP piping. The scheme is located in the west of the Republic of Panama, near the village of Boqueron, 30 km from the town of David, in Chiriqui Province. It was designed by the owner, Istmus Hydropower, and the contractor was Iconsa. The project involves a gravity water conveyance system as well as a high pressure pipe. For this, 2194 m of piping with a diameter varying between 2600 and 2800 mm were considered.
机译:位于巴拿马彼德拉斯河上的康塞普西翁水电项目的装机容量为10兆瓦;两个5兆瓦的弗朗西斯装置在69.45 m的净水头下运行,排放量为20 m3 / s。水通过包括2194 m的GRP管道的压力管道输送到动力室。该计划位于巴拿马共和国西部,靠近Boqueron村,距离奇里基省戴维镇30公里。它是由业主Istmus Hydropower设计的,承包商是Iconsa。该项目涉及重力水输送系统以及高压管道。为此,考虑了直径在2600至2800 mm之间的2194 m管道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号