...
首页> 外文期刊>International Journal on Hydropower & Dams >Saratovskaya Plant Will Have Two Bulb Units Uprated
【24h】

Saratovskaya Plant Will Have Two Bulb Units Uprated

机译:萨拉托夫斯卡亚工厂将升级两个灯泡单元

获取原文
获取原文并翻译 | 示例
           

摘要

Russian equipment supplier Power Machines has signed a contract with the State hydro producer RusHydro to supply ' two replacement turbine-generators for the 1360 MW Saratovskaya hydropower project on the Volga-Kama river, in the western Urals (the European part of the Russian Federation). Power Machines is to design, manufacture, and supply two 54 MW horizontal bulb turbines and generators for delivery in the second quarter of 2010 and the first quarter of 2011. The company is also to provide supervision and technical commissioning supervision.
机译:俄罗斯设备供应商Power Machines已与俄罗斯国家水力发电商RusHydro签订合同,为乌拉尔河西部(俄罗斯联邦的欧洲部分)伏尔加-卡马河上的1360兆瓦Saratovskaya水电项目供应两台替代涡轮发电机。 。 Power Machines将设计,制造和供应2台54 MW卧式球面涡轮机和发电机,分别于2010年第二季度和2011年第一季度交付。该公司还将提供监督和技术调试监督。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号