首页> 外文期刊>International Journal on Hydropower & Dams >New phase of rehabilitation goes ahead at Kainji, Nigeria
【24h】

New phase of rehabilitation goes ahead at Kainji, Nigeria

机译:尼日利亚Kainji的康复工作进入新阶段

获取原文
获取原文并翻译 | 示例
           

摘要

The multipurpose Kainji scheme in Nigeria, constructed in the 1960s, is a key component of the country's water and energy infrastructure. While some individual parts of the scheme have undergone repair and refurbishment in recent years, a comprehensive rehabilitation project is considered long overdue. Companies are now pre-qualifying for a complete upgrade of the scheme, which will offer the possibility to increase energy production for Nigeria, and supply neighbouring countries with additional electricity.
机译:尼日利亚的多用途Kainji计划始建于1960年代,是该国水和能源基础设施的重要组成部分。虽然该计划的某些部分在最近几年已进行了维修和翻新,但全面的修复项目被认为早就应该完成了。现在,公司已经在资格预审中对该计划进行了全面升级,这将有可能增加尼日利亚的能源生产,并为邻国提供更多的电力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号