...
首页> 外文期刊>International Journal on Hydropower & Dams >Rehabilitation and completion works at Bumbuna Falls
【24h】

Rehabilitation and completion works at Bumbuna Falls

机译:Bumbuna Falls的修复和完工工程

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents an overall description of rehabilitation and completion works at the Bumbuna Falls scheme in Sierre Leone, where work (80 per cent complete) was interrupted by civil war during the 1990s. The authors describe some specific aspects of the rehabilitation of civil structures and main equipment, with emphasis on: the assessments, criteria, specifications and construction methods; procedures for monitoring and dam safety control; and, conclusions which can be drawn from the Bumbuna case.
机译:本文全面介绍了谢尔利昂的Bumbuna Falls计划的修复和完工工程,该工程(已完成80%)在1990年代因内战而中断。作者描述了民用建筑和主要设备修复的一些具体方面,重点是:评估,标准,规格和施工方法;监测和大坝安全控制程序;以及可以从Bumbuna案中得出的结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号