...
首页> 外文期刊>International Journal on Hydropower & Dams >I rape: a major new scheme for the Jequitinhonha valley
【24h】

I rape: a major new scheme for the Jequitinhonha valley

机译:我强奸:耶基蒂宁哈河谷的一项重大新计划

获取原文
获取原文并翻译 | 示例
           

摘要

This 360 MW project, now going ahead in Minas Gerais, Brazil, will incorporate Brazil's highest rockfill dam. The main features of the scheme, its role in the social and economic development of the Jequitinhonha valley, and challenges posed by the geology and topography at the site, are described here. The Irape hydro plant, on the Jequitinhonha river, on the border between the municipalities of Berilo and Grao-Mogol in Brazil, will have an installed capacity of 360 MW. Owned by Companhia Energetica de Minas Gerais - CEMIG, and being implemented by the Irape Construction Consortium, this plant is part of a large and challenging engineering project; it also represents a major step for the social and economic development of the Jeti-quitinhonha Valley.
机译:这个目前在巴西米纳斯吉拉斯州进行的360兆瓦项目将纳入巴西最高的堆石坝。此处描述了该计划的主要特征,其在Jequitinhonha山谷的社会和经济发展中的作用以及该地点的地质和地形构成的挑战。位于巴西贝里洛(Berilo)与格劳莫高勒(Grao-Mogol)市之间边界的Jequitinhonha河上的Irape水电站的装机容量为360兆瓦。该工厂由CEMIG的Companhia Energetica de Minas Gerais拥有,并由Irape建筑协会负责实施,是大型且具有挑战性的工程项目的一部分。这也是Jeti-quitinhonha山谷社会和经济发展的重要一步。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号