...
首页> 外文期刊>International Journal on Hydropower & Dams >Pumped storage contributes to China's peak energy requirements
【24h】

Pumped storage contributes to China's peak energy requirements

机译:抽水蓄能助力中国高峰能源需求

获取原文
获取原文并翻译 | 示例
           

摘要

Among the many hydroelectric projects currently under construction in China are several pumped-storage schemes designed to meet peak electricity needs and help satisfy the nation's rapid pace of economic development and related demand for energy. One of these is the 1200 MW Xilongchi scheme in northern China. Designed to take advantage of the highest head available in the country and the third highest in the world, the project is outstanding in its design and scope of construction. Shani Wallis visited the project in June 2004 to bring this report.
机译:在中国目前正在建设的众多水力发电项目中,有数个抽水蓄能方案旨在满足高峰用电需求,并帮助满足国家经济发展的快速步伐和相关能源需求。其中之一是中国北方的1200兆瓦西龙池计划。该项目旨在利用该国最高的水头和世界第三的水头,在设计和施工范围上均十分出色。 Shani Wallis于2004年6月访问了该项目,并带来了这份报告。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号