Contract documents for the effective construction management of large hydro projects

机译:大型水电项目有效施工管理的合同文件

获取原文
获取原文并翻译 | 示例
           

摘要

During the last 25 years, several hydro projects, particularly in developing countries, have suffered significant problems during construction, sometimes leading to serious delays in completion, commissioning and generation of revenues, and substantial overruns in direct and indirect project costs. In many cases, these problems can be attributed to inadequacies In the bid and contract documents. This article examines the various constituents of typical contract documents and makes practical recommendations regarding their refinement, to facilitate effective construction management and control of costs.
机译:在过去的25年中,几个水电项目,特别是在发展中国家的水电项目,在施工过程中遇到了严重的问题,有时会导致竣工,调试和创收方面的严重延误,以及直接和间接项目成本的大量超支。在许多情况下,这些问题可以归因于投标和合同文件中的不足。本文研究了典型合同文件的各个组成部分,并提出了一些完善的实用建议,以促进有效的施工管理和成本控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号