...
首页> 外文期刊>International journal of information technology project management >A Multi-Agent Optimization Method for Preemptive Resource-Constrained Project Scheduling
【24h】

A Multi-Agent Optimization Method for Preemptive Resource-Constrained Project Scheduling

机译:抢先资源受限项目调度的多智能体优化方法

获取原文
获取原文并翻译 | 示例
           

摘要

A multi-agent optimization method is proposed to solve the preemptive resource-constrained project scheduling problem in which activities are allowed to be preempted no more than once. The proposed method involves a multi-agent system, a negotiation process, and two types of agents (activity agents and schedule agent). The activity agents and the schedule agent negotiate with each other to allocate resources and optimize the project schedule. Computational experiments were conducted using the standard project scheduling problem sets. Compared with prior studies, results of the proposed method are competitive in terms of project makespan. The method can be extended to other preemptive resource-constrained project scheduling problems.
机译:提出了一种多智能体优化方法,解决了先占资源受限的项目调度问题。所提出的方法涉及多代理系统,协商过程以及两种类型的代理(活动代理和调度代理)。活动代理和进度计划代理相互协商以分配资源并优化项目进度。使用标准项目计划问题集进行了计算实验。与以前的研究相比,该方法的结果在项目完成时间方面具有竞争力。该方法可以扩展到其他抢先资源受限的项目计划问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号