...
首页> 外文期刊>International Journal of Production Research >Economic lot and supply scheduling problem: a time-varying lot sizes approach
【24h】

Economic lot and supply scheduling problem: a time-varying lot sizes approach

机译:经济批量和供应计划问题:批量时变方法

获取原文
获取原文并翻译 | 示例
           

摘要

We study the economic lot and supply scheduling problem (ELSSP) that arises in the distribution and manufacturing industries. The ELSSP involves the simultaneous scheduling of end-item production and inbound transportation of input materials over an infinite time horizon to minimise the average costs of inventory, production set-up and transportation. We present a new methodology based on a time-varying lot sizes approach for the ELSSP. We also provide computational experiments showing that the developed algorithm outperforms the existing heuristic for improved integrated scheduling.
机译:我们研究了分销和制造业中出现的经济批量和供应计划问题(ELSSP)。 ELSSP涉及在无限的时间范围内同时安排最终产品生产和输入物料的入库运输,以最大程度地减少库存,生产设置和运输的平均成本。我们为ELSSP提供了一种基于时变批量方法的新方法。我们还提供了计算实验,表明所开发的算法在改进集成调度方面优于现有启发式算法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号