首页> 外文期刊>Work study >Assessing Egyptian construction projects performance using principal component analysis
【24h】

Assessing Egyptian construction projects performance using principal component analysis

机译:使用主成分分析评估埃及建筑项目的绩效

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - The construction sector is a major contributor to the Egyptian economy and gross domestic products, plus considered as one of its fastest-growing sectors. Various deficiencies such as low productivity, delays, cost overrun, poor quality, etc. have plagued the construction sector, leading to undesirable project performance across Egypt and several other countries. One of the best methods to measure and improve performance evaluation and consequently a step toward industry improvement is key performance indicators (KPIs). The paper aims to discuss this issue. Design/methodology/approach - A questionnaire survey was conducted to identify the importance index for 35 KPIs. The KPIs were identified and selected based on an extensive literature review and one on one interview with expert construction professionals. Moreover, exploratory factor analysis method has been used to analyze and determine the inter-relationships between the set of indicators. Findings - Seven indicators that have the highest importance indicator were selected to create project overall performance indicator assessment models to consistently measure the performance of different construction projects. Seven equations are introduced reflecting the output of the research while considering both organization size and project type. Practical implications - The proposed evaluation assessment models can be used to: evaluate the relative success of projects; indicate the areas of strengths and weaknesses in performance and establish company benchmarking. Three projects were selected to validate the performance evaluation models. Originality/value - This paper provides mathematical assessment models for evaluating overall construction project performance in Egypt, taking into consideration organization size and project type. Previously published research works on the subject matter are quite limited, and frequently deal with only one or two selected aspects.
机译:目的-建筑业是埃及经济和国内生产总值的主要贡献者,并且被认为是埃及发展最快的产业之一。诸如生产率低下,延误,成本超支,质量差等各种缺陷困扰着建筑部门,导致埃及和其他几个国家的项目表现不佳。关键绩效指标(KPI)是衡量和改进绩效评估的最佳方法之一,因此也是朝着行业发展迈出的一步。本文旨在讨论这个问题。设计/方法/方法-进行了问卷调查,以确定35个KPI的重要性指数。根据广泛的文献综述和与专业建筑专业人员的一对一访谈,确定并选择了KPI。此外,探索性因素分析方法已用于分析和确定指标集之间的相互关系。调查结果-选择了七个具有最高重要性指标的指标来创建项目总体绩效指标评估模型,以一致地衡量不同建设项目的绩效。在考虑组织规模和项目类型的同时,引入了七个反映研究成果的方程式。实际意义-提议的评估评估模型可用于:评估项目的相对成功;指出绩效方面的优势和劣势,并建立公司基准。选择了三个项目来验证绩效评估模型。创意/价值-本文提供了数学评估模型,用于评估埃及的总体建设项目绩效,同时考虑了组织规模和项目类型。先前发表的有关该主题的研究著作非常有限,并且经常只涉及一个或两个选定的方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号