首页> 外文期刊>International journal of water resources development >Hydropower production without sacrificing environment: a case study of Ilisu Dam and Hasankeyf
【24h】

Hydropower production without sacrificing environment: a case study of Ilisu Dam and Hasankeyf

机译:在不牺牲环境的前提下进行水电生产:以伊利苏水坝和哈桑基夫为例

获取原文
获取原文并翻译 | 示例
           

摘要

The Ilisu Dam and HEPP Project, on the Tigris River in the South-Eastern Anatolia Region of Turkey, has been under debate for more than half a century due to its possible adverse effects on the environment. In particular, the proposed inundation of the archaeological sites around Hasankeyf has prompted strong criticism from national and international organizations. The primary reason for the administration's insistence on construction of the dam is its energy production capacity. The present study is an assessment of an alternative solution that not only saves Hasankeyf with its countless ancient monuments from inundation but also supplies the projected energy production of Ilisu Dam.
机译:土耳其东南部安纳托利亚地区底格里斯河上的伊利苏水坝和HEPP项目由于可能对环境造成不利影响,已经争论了半个多世纪。特别是,Hasankeyf周围的考古遗址被淹没的提议引起了国家和国际组织的强烈批评。政府坚持建造大坝的主要原因是其能源生产能力。本研究是对替代解决方案的评估,该解决方案不仅可以使Hasankeyf及其众多的古迹免于洪水泛滥,还可以为Ilisu大坝提供预计的能源生产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号