首页> 外文期刊>International Power Generation >Pricing up Candu reactors
【24h】

Pricing up Candu reactors

机译:坎杜反应堆定价

获取原文
获取原文并翻译 | 示例
           

摘要

The US$2.9 billion Qinshan Phase Ⅲ nuclear power project in China is due to be completed in 2003. It is on time and on budget. AECL (Atomic Energy of Canada Limited) in partnership with the Chinese utility, TQNPC (Third Qinshan Nuclear Power Company) is managing construction of 2 x 700MWe Class CANDU reactors. The reactors are being built as a full-scope and firm-price turnkey project. AECL, the lead contractor, designer and builder is managing construction in partnership with TQNPC. Financing for the Qinshan Phase Ⅲ project was provided by export credit agencies from Canada, the US, Japan and Korea. The basis for this type of nuclear plant financing has been established by the Organisation for Economic Co-Operation and Development (OECD) policies on export credit arrangements for nuclear plant.
机译:中国29亿美元的秦山三期核电项目将于2003年完成。该项目按时并按预算进行。 AECL(加拿大原子能有限公司)与中国公用事业公司TQNPC(第三秦山核电公司)合作管理2座700MWe级CANDU反应堆的建设。反应堆是作为一个范围广泛,价格固定的交钥匙工程而建造的。首席承包商,设计师和建筑商AECL正在与TQNPC合作管理施工。秦山三期项目的资金来自加拿大,美国,日本和韩国的出口信贷机构。经济合作与发展组织(OECD)关于核电厂出口信贷安排的政策已经为此类核电厂筹资奠定了基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号