【24h】

Actuating new technology

机译:启动新技术

获取原文
获取原文并翻译 | 示例
           

摘要

In January of this year Rotork Controls secured a contract to replace 192 electric valve actuators in one of the UK's newest power generation stations in Connah's Quay, Deeside. The new actuators were fitted into the upgraded cooling towers at the 1,420MW PowerGen station.rnThe plant entered commercial operation in 1996 using the latest combined cycle gas turbine (CCGT) technology to generate electricity cleanly and efficiently, using gas extracted from Liverpool Bay nearby. The original actuator contract had been awarded to one of Rotork's competitors - Mike Dale, services and site projects manager at Rotork said: "Our competitor kept dropping its price and it was eventually awarded the contract over us."
机译:今年1月,Rotork Controls获得了一份合同,以更换位于Denside的Connah码头的英国最新的发电站之一中的192个电动阀门执行器。新的执行器安装在1,420MW PowerGen电站升级后的冷却塔中。该工厂于1996年进入商业运营,使用最新的联合循环燃气轮机(CCGT)技术,利用从附近利物浦湾提取的气体清洁高效地发电。最初的执行器合同已授予Rotork的竞争对手之一-Rotork的服务和现场项目经理Mike Dale说:“我们的竞争对手不断降低价格,最终被授予了我们的合同。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号