首页> 外文期刊>International railway journal >Network Rail to invest £25bn and cut costs by 20%
【24h】

Network Rail to invest £25bn and cut costs by 20%

机译:Network Rail将投资250亿英镑并将成本削减20%

获取原文
获取原文并翻译 | 示例
           

摘要

Britain's infrastructure manager, Network Rail (NR), has agreed to spending and performance targets laid down by the Office of Rail Regulation (ORR) for 2014-2019 known as Control Period 5 (CP5). NR will invest £12bn on infrastructure renewals and a further £12.8bn for enhancements, including electrification and the Thameslink and Crossrail projects, during CP5, which in total is about £1bn more than in CP4.
机译:英国基础设施经理Network Rail(NR)已同意由铁路法规办公室(ORR)制定的2014-2019年支出和绩效目标,即控制期5(CP5)。 NR在CP5期间将投资120亿英镑用于基础设施更新,并进一步投资128亿英镑用于电气化以及Thameslink和Crossrail项目的改善,总计比CP4多约10亿英镑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号