...
首页> 外文期刊>International railway journal and rapid transit review >Route selected for Poland's first HS line
【24h】

Route selected for Poland's first HS line

机译:选择波兰第一条HS线的路线

获取原文
获取原文并翻译 | 示例
           

摘要

Polish infrastructure manager PKP PLK has selected the route for the new high-speed line that will link Warsaw via Lodz to Wroclaw and Poznan from the results of a study conducted by a consortium of Idiom, Spain and Biuro Project Communication. The 469km Y-shaped line is estimated to cost at least Zlotys 20bn ($US 6.19bn) to construct, with the Polish government aiming to begin work in 2014 and complete the project by 2020. A tender will be issued in the coming months to select a consultant to assist with securing financial support for the project, with a concession system or a public-private partnership structure favoured.
机译:波兰基础设施经理PKP PLK从Idiom,西班牙和Biuro Project Communication联合体进行的一项研究结果中,选择了一条新的高速线路线,该路线将通过罗兹将华沙连接到弗罗茨瓦夫和波兹南。一条长469公里的Y形线估计至少要花费200亿兹罗提(61.9亿美元),波兰政府的目标是在2014年开始工作,并在2020年之前完成该项目。选择一个顾问,以协助该项目获得财政支持,并采用优惠系统或公私伙伴关系结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号