...
首页> 外文期刊>International Sugar Journal >Water management The Davco groundwater project - a grower initiated multidisciplinary approach to groundwater management in the Burdekin District
【24h】

Water management The Davco groundwater project - a grower initiated multidisciplinary approach to groundwater management in the Burdekin District

机译:水资源管理Davco地下水项目-种植者在Burdekin区启动了地下水管理的多学科方法

获取原文
获取原文并翻译 | 示例
           

摘要

Groundwater levels in the Burdekin Haughton Water Supply Scheme area (BHWSS) have been consistently rising at about 500 mm/annum, since the development of 40 000 ha of additional irrigation land within the Burdekin River Irrigation Area (BRIA). During 2007 Davco Farming, alarmed by the continued rise in groundwater levels, applied for and was granted, $670 000 through the Regional and Community Projects (RCP), under the Sugar Industry Reform Programme 2004, for a project titled Managed utilisation of elevated salinity groundwater to control rising water tables and improve cane yield. The primary objective of this project was to show if rising groundwater levels could be arrested by intensive pumping on the Davco Farming property. This site was seen as strategically important, since the property spans over 12 km east to west and its long axis is perpendicular to most of the groundwater flow as it moves from the upslope zones of the BRIA to the sea. These funds, along with over $1.2 million of Davco Farming monies, have been invested in resistivity studies by Charles Sturt University, additional groundwater drilling, pumping infrastructure, a network of data-logged observation bores, Dualem mapping, and the installation of lysimeters to measure deep drainage losses on a test field. The results from this work will provide other Burdekin growers with additional information on ways to deal with rising groundwater, the effects of conjunctive water use strategies on both the crop and soil characteristics, and the likely costs involved. Only 5339 ML were pumped in the 2009-2010 year. It seems likely that increased volumes of water will need to be pumped to show if the Davco groundwater project is having an influence on regional groundwater levels. Initial results suggest the increased usage of saline waters has had no negative impacts on soil structure or sugarcane yields.
机译:自Burdekin河灌溉区(BRIA)开发了40 000公顷额外的灌溉用地以来,Burdekin霍顿供水计划区(BHWSS)的地下水位一直以每年约500毫米的速度增长。在2007年,Davco农业公司因地下水位持续上升而感到震惊,并根据2004年制糖工业改革计划通过区域和社区项目(RCP)申请并获得了670,000美元的资助,该项目的目标是高盐分地下水的管理利用控制上升的地下水位并提高甘蔗产量。该项目的主要目的是显示是否可以通过在Davco Farming物业上大量抽水来阻止地下水位上升。该地点被视为具有战略意义,因为该物业从东到西跨度超过12公里,并且其长轴从BRIA的上坡区移向海洋时垂直于大部分地下水流。这些资金以及超过120万美元的Davco Farming款项,已由查尔斯斯特大学(Charles Sturt University)投资于电阻率研究,额外的地下水钻井,抽水基础设施,数据记录的观测孔网络,Dualem制图和安装测渗仪以进行测量试验场的深层排水损失。这项工作的结果将为其他Burdekin种植者提供更多信息,以应对地下水增加的方法,联合用水策略对作物和土壤特性的影响以及可能涉及的成本。在2009-2010年,仅泵送了5339 ML。似乎有必要增加水的抽取量,以显示Davco地下水项目是否对区域地下水水位有影响。初步结果表明,盐水使用量的增加对土壤结构或甘蔗产量没有负面影响。

著录项

  • 来源
    《International Sugar Journal》 |2011年第1350期|p.461|共1页
  • 作者单位

    Davco Farming, Ayr;

    HamAg Consultancy, Ayr;

    Department of Environment and Resource Management, Ayr;

    Davco Farming, Ayr;

  • 收录信息 美国《科学引文索引》(SCI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号