首页> 外文期刊>International Water Power & Dam Construction >Works well advanced at Myanmar's Yeywa RCC hydropower scheme
【24h】

Works well advanced at Myanmar's Yeywa RCC hydropower scheme

机译:缅甸的Yeywa RCC水电项目进展顺利

获取原文
获取原文并翻译 | 示例
           

摘要

Excellent progress is reported in the construction of the RCC dam for the Yeywa hydropower scheme in Myanmar, and it is estimated by some that if production rates keep steady then the structure could be finished months early. Concrete placement for the RCC dam is being undertaken by China's Gezhouba Water and Power. The dam will be 134m high and have a volume of approximately 2.4M m~3.
机译:据报道,缅甸Yeywa水电计划的RCC大坝建设取得了良好的进展,据一些人估计,如果生产率保持稳定,则该结构可以提早几个月完工。中国葛洲坝水电局正在为RCC大坝进行混凝土浇筑。大坝高134m,体积约为2.4M m〜3。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号