...
首页> 外文期刊>Jane's Defence Weekly >Accelerated US Navy shipbuilding contracts pay off
【24h】

Accelerated US Navy shipbuilding contracts pay off

机译:加速美国海军造船合同偿还

获取原文
获取原文并翻译 | 示例
           

摘要

Following the Covid-19-induced disruption to the US Navy (USN) shipbuilding industry - causing yards to stagger shifts and take other production-interrupting measures to protect the workforce - the USN has worked to accelerate new construction contracts to create a future backlog and keep money flowing to prime-contractor suppliers. The USN also has sought to further strengthen the supplier base by bolstering programmes such as the Naval Agility (NavalX) Tech Bridge, which is designed to enhance collaboration on naval projects and help support economic opportunities to increase the industrial base's ability to solve naval challenges.
机译:在Covid-19引起的中断美国海军(USN)造船业 - 造成码头的交错措施,采取其他生产中断措施来保护劳动力 - 美国努力加速新的建筑合同,以创造未来的积压和创造未来的积压保持货币流传到主要承包商供应商。 USN还试图通过诸如海军敏捷(Navalx)Tech Bridge,如海军敏捷(Navalx)Tech Bridge等玻璃敏捷计划进一步加强供应商基地,该技术旨在加强对海军项目的合作,并帮助支持经济机会增加产业基地解决海军挑战的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号