...
首页> 外文期刊>Jane's Defence Weekly >Maiden flight of first EMD Red Hawk jet slated for late 2021
【24h】

Maiden flight of first EMD Red Hawk jet slated for late 2021

机译:Maiden First First Emd Red Hawk Jet Matted 2021年底

获取原文
获取原文并翻译 | 示例
           

摘要

The US Air Force (USAF) has slated September 2021 for the maiden flight of the first of five engineering and manufacturing development (EMD) Boeing-Saab T-7A Red Hawk advanced jet trainer aircraft, Janes has learned. With production of the EMD aircraft set to begin soon at Boeing's St Louis facility in Missouri and Saab's Linkoping facility in Sweden, a USAF official told Janes on 18 August that the hitherto undisclosed date for the first EMD flight has now been set. "Saab has released all EMD aircraft 'build-to-packages' to support build and manufacturing preparation. The EMD [aft] fuselages [five in total] are currently planned for build at Saab's factory in Sweden with delivery [to St Louis] no later than April 2021. Production is expected to begin with jig load [this] August at Boeing in St Louis. Boeing currently plans for assembly to be complete in June 2021, with the first EMD flight expected in September 2021," the USAF said.
机译:Janes已经学会了美国空军(EMD)5021年9月2021年9月2021年为第一个工程和制造业开发(EMD)波音 - 萨博T-7A Red Hawk先进的喷气式训练师飞机。通过生产EMD飞机在瑞典的Boeing的St Louis设施开始于瑞典的Boeing的ST Louis设施,USAF官员于8月18日告诉Janes,现在已经设定了第一个EMD航班的迄今为止未公开的日期。 “Saab发布了所有EMD飞机的”建立包装“,以支持构建和制造准备。EMD [AFT]机身[总计]目前正在瑞典萨博工厂计划在瑞典的工厂进行[至St路易斯]没有早于4月2021年。预计产量将从Jig Load [本]八月在圣路易斯波音。波音公司于2021年6月2021年6月预计将于6月20日举行计划,“USAF表示。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号