首页> 外文期刊>Jane's navy international >Spain completes critical design review for S 80 submarine
【24h】

Spain completes critical design review for S 80 submarine

机译:西班牙完成对S 80潜艇的关键设计审查

获取原文
获取原文并翻译 | 示例
           

摘要

The Critical Design Review (CDR) for Spain's long-delayed S 80 diesel-electric submarine (SSK) programme has been completed. Announcement of a new schedule for the four-boat programme is now awaited, although successful completion of the CDR paves the way for production to begin. Navantia said the Ministry of Defence (MoD) had accepted the design changes on first-in-class vessel Isaac Peral (S 81). The boats' design length has been extended from 71 m to 80 m to address weight and balance problems.
机译:西班牙长期延迟的S 80柴油-电力潜艇(SSK)计划的关键设计评审(CDR)已完成。尽管CDR的成功完成为生产开始铺平了道路,但现在仍在等待有关四船计划的新时间表的宣布。纳万蒂亚说,国防部已经接受了一流的艾萨克·佩拉尔号(S 81)舰的设计变更。该船的设计长度已从71 m扩展到80 m,以解决重量和平衡问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号