【24h】

In brief

机译:在信中

获取原文
获取原文并翻译 | 示例
       

摘要

The US Navy's first-of-class aircraft carrier Gerald R Ford was launched on 11 October at Huntington Ingalls Industries' Newport News Shipbuilding. Under construction since November 2009, Ford will undergo afloat testing before its naming ceremony on 9 November 2013. Pier-side outfitting will then take place. Delivery is expected in 2016. The New Zealand Ministry of Defence (MoD) released on 22 October a request for information (Rfl) for a single, multi-purpose vessel to replace its mine-countermeasures, diving support, and hydro-graphic survey ship classes, to meet the 2010 Defence White Paper's requirement for a Littoral Operations Support Capability. The 150 m vessel, designed to integrate with a range of capabilities, may be built overseas. The MoD is seeking responses by 2 December.
机译:美国海军第一流的航母杰拉尔德·R·福特于10月11日在亨廷顿英格尔斯工业公司的纽波特纽斯造船厂发射升空。自2009年11月开始建造以来,福特将在2013年11月9日的命名仪式之前接受浮球测试。随后将进行码头侧装备。预计将于2016年交付。新西兰国防部(MoD)于10月22日发布了要求提供信息的一艘多用途船只的信息(Rfl),以替换其防雷,潜水和水文测绘船课程,以符合《 2010年国防白皮书》对沿海作战支援能力的要求。 150 m的船舶设计为可与多种功能集成,可以在国外建造。国防部正在寻求在12月2日之前做出回应。

著录项

  • 来源
    《Jane's navy international》 |2013年第9期|410|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号