首页> 外文期刊>Jane's navy international >USCG recapitalisation 'way too slow', says chief
【24h】

USCG recapitalisation 'way too slow', says chief

机译:首席军官说,USCG的注资“太慢”

获取原文
获取原文并翻译 | 示例
           

摘要

The recapitalisation of the US Coast Guard's (USCG's) ageing fleet is progressing "way too slow" in an era of shrinking budgets, the service's uniformed chief told the Navy League Sea-Air-Space conference on 16 April. With some of its vessels well over 40 years old, plans by the USCG to commence routine operations in the Arctic meant that other missions would have to be terminated, said its commandant, Admiral Robert Papp. The third Legend-class National Security Cutter (NSC) was commissioned recently, but "we should have been up to NSC number 6 right now", he said. However, he said he had "high confidence" that all 58 of the smaller Sentinel-class cutters would eventually be built.
机译:美国海军陆战队服役的军官在4月16日的海军联盟海空会议上说,在预算紧缩的时代,美国海岸警卫队(USCG)老化舰队的注资工作“进展太慢”。美国海军陆战队司令罗伯特·帕普上将说,由于其某些船只的使用年限已超过40年,美国海岸警卫队计划在北极开始常规行动,这意味着必须终止其他任务。他说,第三个传奇级国家安全切割机(NSC)最近投入使用,但是“我们现在应该达到NSC第6级”。但是,他说,他对所有58台较小的Sentinel级切割机都将最终制造具有“高度信心”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号