首页> 外文期刊>Jane's navy international >UK future carrier clears first major hurdle
【24h】

UK future carrier clears first major hurdle

机译:英国未来航母清除了第一个主要障碍

获取原文
获取原文并翻译 | 示例
           

摘要

The UK Ministry of Defence (MoD) has released GPB300 million (USD532 million) for detailed design-and-production engineering activities for the Royal Navy's Future Aircraft Carrier (CVF) after the GBP3.5 billion programme passed through the first of two hurdles in its Main Gate approvals process. At the same time, the MoD has announced agreement on the roles and responsibilities within the Aircraft Carrier Alliance (ACA) charged with building the two ships, confirmed the addition of VT Group and Babcock to the ACA, and rubber-stamped the shipbuilding strategy for the programme.
机译:英国国防部(MoD)为皇家海军的未来航空母舰(CVF)的详细设计和生产工程活动提供了3亿英镑的资金,这笔耗资35亿英镑的计划通过了两个障碍中的第一个它的正门批准程序。同时,国防部宣布就负责建造这两艘船的航空母舰联盟(ACA)中的角色和责任达成协议,确认将VT Group和Babcock添加到ACA中,并为该船的造船战略加盖橡皮图章该程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号