首页> 外文期刊>Jane's navy international >I-SSGW delay vexes bidders, puts pressure on delivery
【24h】

I-SSGW delay vexes bidders, puts pressure on delivery

机译:I-SSGW延迟骂人投标人,对交货的压力

获取原文
获取原文并翻译 | 示例
           

摘要

More than two years after first advertising its requirement for a stopgap anti-ship missile to replace the soon-to-retire Harpoon Block 1C, the UK Ministry of Defence (MoD) has still to formally invite bids from industry. The delay in kicking off the GBP200 million (USD278 million) Interim Surface-to-Surface Guided Weapon (I-SSGW) competition has caused frustration among the potential candidates, while at the same time narrowing the window for delivery of the new long-range anti-surface warfare (ASuW) capability ahead of the December 2023 out-of-service date (OSD) for Harpoon and the associated GWS60 ship system. Israel Aerospace Industries (IAI), Raytheon, and Saab are all expected to vie for the contract.
机译:超过两年的广告,首次广告其要求停止防船导弹,以取代即将退休的胡椒块1C,英国国防部(Mod)仍然正式邀请行业出价。 延迟启动2亿(2780万美元)临时面对面导游武器(I-SSGW)竞争导致潜在候选人之间的挫败感,同时缩小窗口以交付新的远程 2023年12月2023年12月超出服务日期(OSD)的反表面战(ASUW)能力,以及Harpoon和相关的GWS60船系统。 以色列航空航天工业(IAI),Raytheon和Saab全部预期为合同vie。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号