...
首页> 外文期刊>Japanese railway engineering >JR Central - Urgent Response to Linked Earthquakes
【24h】

JR Central - Urgent Response to Linked Earthquakes

机译:JR中央-对联系地震的紧急反应

获取原文
获取原文并翻译 | 示例
           

摘要

Central Japan Railway Company (JR Central) started construction in May 2012 to enhance the functions of the earthquake disaster prevention system of the Tokaido Shinkansen. It has completed installing the functions of urgent response to linked earthquakes. The upgraded system was put into service from February 22, 2013. The construction to enhance the functions of the system was carried out based on knowledge obtained from the Great East Japan Earthquake. The objective is to issue emergency stop command to trains early and reliably.
机译:为了增强东海道新干线的地震防灾系统的功能,中部中央铁路公司(JR中央)于2012年5月开始建设。它已完成对紧急地震的紧急响应功能的安装。升级后的系统于2013年2月22日投入使用。增强系统功能的构造是基于从东日本大地震中获得的知识而进行的。目的是发出紧急停车命令,以尽早可靠地进行训练。

著录项

  • 来源
    《Japanese railway engineering》 |2013年第3期|14-14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号