...
首页> 外文期刊>Japanese railway engineering >Reinforcement of 'earthquake disaster prevention system'
【24h】

Reinforcement of 'earthquake disaster prevention system'

机译:加强“地震防灾体系”

获取原文
获取原文并翻译 | 示例
           

摘要

JR Central announced in April 2012 that they strengthen the function of the "earthquake disaster prevention system" which has been managed on the Tokaido Shinkansen. Based on the lessons got through the past technology development and the East Japan great earthquake disaster, they have realized the shortening of time until train stop when a directly underneath earthquake occur and the train stop when predicted the outbreak of a consolidated type earthquake. In addition to the increase of the spare battery of various seismometers also, they stop trains more speedy and more surely when an earthquake occurred, thus safety raising father. The total cost of this measure is approximately 360 million yen. It starts in use at the point where the construction finishes sequentially, and all constructions are going to end by July FY2013.
机译:JR Central在2012年4月宣布,他们将加强在东海道新干线上管理的“地震防灾系统”的功能。基于过去技术开发和东日本大地震灾难的经验教训,他们意识到缩短直达地震发生时的火车停站时间和预测合并型地震爆发时的火车停站时间的缩短。除了增加各种地震仪的备用电池外,它们在地震发生时也能更迅速,更可靠地停止火车行驶,从而提高了父亲的安全感。这项措施的总成本约为3.6亿日元。它在施工按顺序完成的时候开始使用,所有施工将于2013财年7月结束。

著录项

  • 来源
    《Japanese railway engineering》 |2012年第3期|p.13|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号