...
首页> 外文期刊>Japanese railway engineering >Renovation of Maintenance of Electric Equipment
【24h】

Renovation of Maintenance of Electric Equipment

机译:电气设备维修翻新

获取原文
获取原文并翻译 | 示例
           

摘要

Maintenance inspection methods of railway electric equipment should be changed from conventional methods which mostly depend upon visual inspection to those made by use of measurement equipment, etc., and toward quantification of inspection result. And rate of maintenance inspection made by use of state monitoring equipment should be enlarged in order to achieve labor-saving of inspection works. Furthermore hereinafter we intend to engage in renovation of maintenance works of railway electric equipment, aiming at achieving longer life-time of related equipment and constituting altogether replacement system of equipment by promoting mechanization/ automation of related work methods.
机译:铁路电气设备的维修检查方法应从以往主要依靠目视检查的常规方法改为使用测量设备等进行的检修方法,并应将检查结果量化。并应增加使用状态监测设备进行维护检查的比率,以节省检查工作的人工。此外,在下文中,我们打算进行铁路电气设备维修工作的翻新,以期延长相关设备的使用寿命,并通过促进相关工作方法的机械化/自动化来构成设备的整体更换系统。

著录项

  • 来源
    《Japanese railway engineering》 |2010年第168期|p.16-18|共3页
  • 作者单位

    Railway Operation Headquarters Technical Research and Development Department West Japan Railway Company;

    rnRailway Operation Headquarters Technical Research and Development Department West Japan Railway Company;

    rnRailway Operation Headquarters Technical Research and Development Department West Japan Railway Company;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号