...
首页> 外文期刊>Journal of Construction Engineering and Management >Discussion of 'Fuzzy Analytical Hierarchy Process Risk Assessment Approach for Joint Venture Construction Projects in China' by Guomin Zhang and Patrick X. W. Zou
【24h】

Discussion of 'Fuzzy Analytical Hierarchy Process Risk Assessment Approach for Joint Venture Construction Projects in China' by Guomin Zhang and Patrick X. W. Zou

机译:张国敏,邹国强,“中国合资建设项目的模糊层次分析法风险评估方法”讨论

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The discussed paper presents a case study using 20 criteria (Fig. 2) selected from 39 listed risk factors presumably associated with joint ventures in the Chinese construction market. However, there are two things under concern: the suitability of adopting those 20 criteria to assess risks in construction projects undertaken by joint ventures in China; and the relationships that existed among those criteria.
机译:所讨论的论文提供了一个案例研究,使用了20个标准(图2),这些标准选自39个列出的风险因素,这些风险因素可能与中国建筑市场中的合资企业有关。但是,有两点值得关注:采用这20条标准评估在中国合资企业进行的建设项目中的风险是否合适;以及这些标准之间存在的关系。

著录项

  • 来源
  • 作者

    Zhen Chen; Heng Li;

  • 作者单位

    School of the Built Environment, Heriot-Watt Univ., Edinburgh, EH 14 4AS, UK;

    Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Horn, Kowloon, Hong Kong;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号