Application of Innovative Critical Chain Method for Project Planning and Control under Resource Constraints and Uncertainty

机译:资源约束与不确定性下创新关键链方法在项目计划与控制中的应用

获取原文
获取原文并翻译 | 示例
           

摘要

This research proposes an innovative critical chain method (ICCM) for project planning and control under resource constraints and uncertainty. An improved genetic algorithm is developed to identify the critical chain and to obtain the optimal start time of each activity under the most optimistic duration of each activity and resource constraints. Furthermore, a feeding buffer is added in an insert point in order to deal with uncertainties. The benefits of applying this ICCM are demonstrated in an example project.
机译:这项研究提出了一种创新的关键链方法(ICCM),用于在资源受限和不确定性的情况下进行项目计划和控制。开发了一种改进的遗传算法来识别关键链并在每个活动的最乐观持续时间和资源约束下获得每个活动的最佳开始时间。此外,在插入点中添加进料缓冲区以应对不确定性。在示例项目中演示了应用此ICCM的好处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号