The Use of Life Cycle Cost Analysis to Determine the Most Effective Cost of Installation High Voltage Undersea Cable Bali Strait

机译:使用生命周期成本分析确定安装高压海底电缆巴厘岛海峡的最有效成本

获取原文
获取原文并翻译 | 示例
           

摘要

Indonesian National Electricity Company (PT.PLN (Persero)) has planned to install additional high voltage undersea cable for circuit Ⅲ and Ⅳ Java-Bali to fulfill electricity demand in Bali. This project was more prefered compared to building another power plant in Bali which could raise social and cultural resistance. Life cycle cost method was used to complete the financial feasibility study to ensure if the project has economic benefit, and the asset would be used effectively and efficiently along its benefit period. In this paper, a life cycle cost will be simulated to analyze which alternative is the most profitable: installation circuit Ⅲ and Ⅳ in 2012 or installation circuit Ⅲ in 2012 and circuit Ⅳ in 2017 in accordance with load forecasting demand. This study is used to help the management to make a decision about the project.
机译:印度尼西亚国家电力公司(PT.PLN(Persero))计划为Java巴厘岛Ⅲ和Ⅳ电路安装额外的高压海底电缆,以满足巴厘岛的电力需求。与在巴厘岛建立另一座发电厂相比,该项目更可取,因为这可能会引起社会和文化上的抵制。使用生命周期成本法来完成财务可行性研究,以确保该项目是否具有经济利益,并且资产将在其受益期内得到有效利用。本文将根据生命周期成本进行模拟,以根据负荷预测需求,分析哪种方案最有利可图:2012年安装Ⅲ和Ⅳ或2012年安装Ⅲ和Ⅳ于2017年。该研究用于帮助管理层对项目做出决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号