...
首页> 外文期刊>Journal of financial management of property and construction >Effect of change orders on rework in highway projects in Palestine
【24h】

Effect of change orders on rework in highway projects in Palestine

机译:巴勒斯坦公路工程变更单对返工的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - This study aims at identifying the main causes of change orders in highway construction projects, determining the factors that affect rework in highway construction projects, examining the relationship between change orders and rework and at developing a predictive model that will determine the impact of change orders on rework in highway construction projects in Palestine. Design/methodology/approach - A questionnaire survey was used to identify the main change order causes and rework causes from the perspectives of contractors and consultants. The questionnaire contained 16 causes of change orders and 19 causes of rework which had been identified from the literature reviewed. The study also identifies the impact of change orders on rework based on data comprising 22 highway construction projects implemented in Palestine. Both descriptive and inferential statistics were used in analyzing the data. Findings - The study concluded that the five most common causes of change orders can be identified as: change of project scope by owner (additional - enhancement), lack of coordination between construction parties; owner's financial difficulties, change in materials, and errors and omissions in design. The study has also established that among the various factors that causes rework, non-conformance with specification requirements, scope changes, late design changes, lack of labor experience, lack of labor skills and improper subcontractor selection top the list. Using regression analysis, the results reveal a significant relationship between change orders and rework cost in highway construction projects in Palestine. Practical implications - By ranking the various change orders causes and rework causes from the perspectives of consultants and contractors, the study provides a fresh perspective on an old chronic problem in the construction sector. This study has provided evidence on the most significant change orders causes and rework causes in the Palestinian highway construction, as well as the impact of change orders or rework on constructions sites. Finally, although this study is specific to the country of Palestine, its results can be applicable to other developing countries facing similar problems in their public construction sectors. Originality/value - The results address the common causes of change orders and reworks in highway construction projects in Palestine. The results also address the relation between change orders and rework cost based on data collected from highway construction projects implemented in the West Bank in Palestine. This study is the first study conducted in the West Bank in Palestine to identify the change orders and reworks causes in highway construction projects.
机译:目的-本研究旨在确定公路建设项目变更单的主要原因,确定影响公路建设项目返工的因素,检查变更单与返工之间的关系,并开发一种预测模型来确定变更的影响巴勒斯坦公路建设项目的返工订单。设计/方法/方法-使用问卷调查从承包商和顾问的角度确定主要的变更单原因和返工原因。该调查表包含16个变更单原因和19个返工原因,这些原因已从所回顾的文献中确定。该研究还基于包括在巴勒斯坦实施的22个高速公路建设项目的数据,确定了变更单对返工的影响。描述性统计和推论统计都用于分析数据。结果-研究得出的结论是,变更单的五个最常见原因可以确定为:业主变更项目范围(附加-增强),施工方之间缺乏协调;所有者的财务困难,材料变更以及设计中的错误和遗漏。这项研究还确定,在导致返工的各种因素中,不符合规格要求,范围变更,后期设计变更,缺乏劳动经验,缺乏劳动技能以及分包商选择不当是首要因素。使用回归分析,结果揭示了巴勒斯坦公路建设项目中的变更单与返工成本之间的显着关系。实际意义-通过从顾问和承包商的角度对各种变更单原因和返工原因进行排名,该研究为建筑行业中的一个老旧问题提供了新的视角。这项研究提供了有关巴勒斯坦公路建设中最重要的变更单原因和返工原因的证据,以及变更单或返工对建筑工地的影响。最后,尽管这项研究仅针对巴勒斯坦国,但其结果可适用于在公共建筑领域面临类似问题的其他发展中国家。原创性/价值-结果解决了巴勒斯坦公路建设项目中变更单和返工的常见原因。该结果还根据在巴勒斯坦西岸实施的高速公路建设项目收集的数据,解决了变更单与返工成本之间的关系。这项研究是在巴勒斯坦西岸进行的第一项研究,旨在确定公路建设项目中的变更单和返工原因。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号