Closure To 'safety Risk Identification And Assessment For Beijing Olympic Venues Construction' By Yu Sun, Dongping Fang, Shouqing Wang, Mengdong Dai, And Xiaoquan Lv

机译:孙宇,方东平,王守清,戴梦东,吕晓泉对“北京奥运场馆建设安全风险识别与评估”的封闭

获取原文
获取原文并翻译 | 示例
           

摘要

mous risks were embedded due to large construction size, tight time schedule, high technical and functional standards, diverse construction types, and innovative designs. These risks would potentially bring negative impact on the performance of Olympic venues' construction such as time delay, cost overrun, safety and environment accidents, and failure to meet the requirements of specific games. There are notable characteristics in the construction program of Beijing Olympic venue constructions, including (1) strict requirements on construction timing and venue functions for games; and (2) centered authority in charge of the Olympic venue construction (namely Construction Department of Beijing Organizing Committee for the Games of the XXIX Olympiad and Beijing Municipality 2008 Construction Headquarter Office). In 2004, the writers were entrusted to lead a team working on the risk management for Beijing Olympic venue construction. Other than normal construction project risk management, this task took the construction program (composed of 31 competition venues) as the objective with focuses on the global risk factors faced by all the venue construction projects and aimed to develop a uniform risk management system for the authority in charge of Olympic venue construction, with which it was expected that the authority could conduct unified risk management for all the venue construction projects to assure best performance of the whole construction program (BOCOG 2005; Zhu et al. 2006; Zhu 2007).
机译:由于施工规模大,时间表紧,技术和功能标准高,施工类型多样以及设计新颖,因此存在大量风险。这些风险可能会对奥运会场馆的施工性能产生负面影响,例如时间延迟,成本超支,安全和环境事故以及无法满足特定运动会的要求。北京奥运会场馆建设方案具有明显的特点,包括:(一)对比赛时间和场馆功能的严格要求; (2)负责奥运场馆建设的中央主管部门(即北京第二十九届奥林匹克运动会组织委员会建设部和北京市2008年建设总部办公室)。 2004年,作家受托领导一个团队,负责北京奥运场馆建设的风险管理。除了正常的建设项目风险管理外,该任务还以建设计划(由31个比赛场馆组成)为目标,重点关注所有场馆建设项目所面临的全球风险因素,旨在为主管部门建立统一的风险管理体系。负责奥运会场馆建设,希望当局能够对所有场馆建设项目进行统一的风险管理,以确保整个建设计划的最佳执行(北京奥组委2005; Zhu等人2006; Zhu 2007)。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号