...
首页> 外文期刊>Journal of Planning History >Planning for Floods at the University of Iowa: A Challenge for Resilience and Sustainability
【24h】

Planning for Floods at the University of Iowa: A Challenge for Resilience and Sustainability

机译:爱荷华大学的洪水规划:弹性和可持续性的挑战

获取原文
获取原文并翻译 | 示例
           

摘要

Why does a large institution build in a flood-prone area and how does it respond when flooding causes great damage? This is a case study of a major flood event-the 2008 Iowa-Cedar River flood-and the University of Iowa, whose recovery is expected to cost about US$750 million. The case explores the factors that led a major institution to invest so much of its infrastructure into a flood-prone river shed and then describes and evaluates the decision-making process the University has undertaken with the goal of becoming a more sustainable and resilient campus.
机译:为什么大型机构要建在容易发生洪灾的地区?当洪灾造成巨大破坏时,它将如何应对?这是一个重大洪水事件的案例研究-2008年爱荷华州-锡达河洪水-和爱荷华大学,其灾后恢复费用预计约为7.5亿美元。该案例探讨了导致一家大型机构将其大量基础设施投资到多洪河河棚的因素,然后描述和评估了大学为实现更加可持续和更具弹性的校园而进行的决策过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号