1. The first of two BUR system demonstrators was handed over to the Germany BWB in May 2009 and the second is due before the end of 2009rn2. The first production order is for 78 systems and the first delivery is planned for 2012rn3. It is believed that the BUER program is receiving TRGS technologyrn4. EADS wins contract for Saudi Arabia's huge MISKA program, which may call for TRGS systems.
展开▼