...
首页> 外文期刊>Leather International >Savar tannery relocation still on hold
【24h】

Savar tannery relocation still on hold

机译:萨瓦制革厂搬迁仍在进行中

获取原文
获取原文并翻译 | 示例
           

摘要

The move to relocate 200 tanneries from the Bangladesh capital to Savar has remained suspended for a decade, due to disagreements between the authorities and tannery owners over who should bear the cost of the move. Tannery owners are unwilling to pay for relocation and the setting up of a central effluent treatment plant (CETP) at the proposed site, some 15 kilometers away from the existing site. They reasoned that the estimated cost for the project has risen five fold in the last decade, and the government was originally responsible for the costs associated with relocation.
机译:由于当局与制革厂所有者之间就谁应承担搬迁费用的分歧,将200家制革厂从孟加拉国首都迁至萨瓦的举动一直暂停了十年。制革厂业主不愿为搬迁和在拟建厂址(距现有厂址约15公里)建立中央污水处理厂(CETP)支付费用。他们认为,该项目的估计成本在过去十年中增长了五倍,而政府最初负责与搬迁相关的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号