...
首页> 外文期刊>Military technology >Defence Production,Procurement and R&D News
【24h】

Defence Production,Procurement and R&D News

机译:国防生产,采购与研发新闻

获取原文
获取原文并翻译 | 示例
           

摘要

ABG Shipyard Cleared to Build Warships for Indian Navy: India's ABG Shipyard Ltd., the country's biggest private shipbuilder, has recently received government clearance to build warships and support vessels for the Indian Navy. The shipyard received a licence on 26 May 2011 that will now allow it to build submarines, attack craft and propulsion systems for the Indian Navy. Wipro, EADS Subsidiaries Tie Up for Aerospace, Defence Manufacture: Wipro Infrastructure Engineering (WIE) has tied up with a subsidiary of EADS to manufacture engineered components for the aerospace and defence sector. The agreement with EADS' Spanish subsidiary, Compania Espanola De Sistemas Aeronauticos (CESA), will entail transfer of some technology and production workload for aerospace actuators and precision parts to Wipro Infrastructure Engineering (WIE). First Phase ofKarwar Naval Base Completed: The first phase of the Karwar Naval Base project has been completed with the commissioning of a civilian township at Amadalli, the last remaining construction activity associated with Phase-I of the project. Speaking at the commissioning of the project, Defence Minister A K Anthony said planning forthe second phase of the project was well underway and work will commence once the cabinet approves the expansion. Phase 2 of the project involves augmentation of facilities at the Naval base to cater for basing of additional ships and submarines at Karwar.
机译:ABG造船厂获准为印度海军建造军舰:印度最大的私人造船厂ABG造船厂有限公司最近获得了政府的许可,可以为印度海军建造军舰和支援舰。该船厂于2011年5月26日获得许可,现在将可以为印度海军建造潜艇,攻击艇和推进系统。 Wipro,EADS子公司争夺航空航天,国防制造:Wipro基础设施工程(WIE)与EADS的子公司紧密合作,为航空航天和国防部门制造工程组件。与EADS西班牙子公司Compania Espanola De Sistemas Aeronauticos(CESA)达成的协议将需要将一些用于航空航天执行器和精密零件的技术和生产工作量转移到Wipro基础设施工程(WIE)。 Karwar海军基地第一阶段完成:Karwar海军基地项目的第一阶段已经完成,Amadalli的一个民用城镇投入使用,这是该项目第一阶段剩余的最后一项建筑活动。国防部长安东尼·安东尼在项目启动仪式上说,该项目第二阶段的计划正在进行之中,一旦内阁批准扩建,工作便会开始。该项目的第二阶段包括增加海军基地的设施,以便为Karwar的其他船只和潜艇提供基础。

著录项

  • 来源
    《Military technology》 |2011年第7期|p.84-85|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号