...
首页> 外文期刊>Military technology >Navantia Cuts Steel for the Second LHD for the Australian Navy
【24h】

Navantia Cuts Steel for the Second LHD for the Australian Navy

机译:纳万提亚为澳大利亚海军第二艘LHD减产

获取原文
获取原文并翻译 | 示例
           

摘要

Navantia has started the construction of the second of two LHDS for the Australian Navy, that will be named ADELAIDE, by cutting the first steel. The cutting started at noon in the facilities of Fene, where the workers got a 3. t piece, belonging to deck number 6 of the ship.rnThis milestone was first programmed for 23 March, but the Fene-Ferrol shipyard has managed to start it 7 weeks ahead of schedule.rnThis contract was signed on 9 October 2007 in Melbourne and includes the design and construction of 2 LHD's, as well as the engines and the integrated platform control system. Navantia and the Australian shipbuilder, BAE Systems Australia Defense, will take on the building work of both ships, with the tasks being shared approximately 80% - 20%, respectively.
机译:纳万提亚已经通过切割第一根钢开始为澳大利亚海军建造两艘LHDS中的第二艘,将被命名为ADELAIDE。切割从中午开始在Fene的设施中进行,工人得到了一块3. t的零件,属于该船的6甲板。rn这个里程碑最初是在3月23日编程的,但是Fene-Ferrol船厂设法将其启动提前7周。该合同于2007年10月9日在墨尔本签署,包括2辆LHD的设计和建造,以及发动机和集成平台控制系统。 Navantia和澳大利亚造船厂BAE Systems澳大利亚国防部将承担这两艘船的建造工作,任务分担约80%-20%。

著录项

  • 来源
    《Military technology》 |2010年第3期|31|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号