...
首页> 外文期刊>Mining Engineering >Bill aims to speed permitting; House legislation asks EPA to review mining permits quickly
【24h】

Bill aims to speed permitting; House legislation asks EPA to review mining permits quickly

机译:比尔旨在加快许可速度;众议院立法要求EPA快速审查采矿许可证

获取原文
获取原文并翻译 | 示例
           

摘要

The legislation is a House version of the so-called Mining Jobs Protection Act that the representatives said would protect Appalachian coal miners from "strangulation by regulation," The House bill, similar to one filed in the Senate, would give the EPA up to 60 days to accept or reject permit applications so that mining companies are not left waiting indefinitely to learn whether they will be allowed to open new operations or to expand existing ones.
机译:该立法是众议院版的所谓的《采矿工作保护法》,代表们说,该法案将保护阿巴拉契亚煤矿工人免于“被法规勒死”。众议院法案与参议院提交的法案相似,将使EPA达到60接受或拒绝许可证申请的天数,这样矿业公司就不会无限期地等待了解他们将被允许开展新业务还是扩大现有业务。

著录项

  • 来源
    《Mining Engineering》 |2011年第4期|p.76-76|共1页
  • 作者

    Anonymous;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号